Job and Batch Costing

6 worked questions on job and batch costing, taken from the 72 in the UniMCQs bank. Each one shows the correct option and the reasoning behind it, so you can check your own working rather than just your answer.

  1. Question 1

    What is the defining feature of a job costing system?

    • Costs are accumulated separately for each individual job carried out to a customer's own specification
    • bCosts are averaged across every unit the factory makes in a period
    • cOnly direct materials are traced, with all labour treated as an overhead
    • dCosts are recorded by calendar month rather than by output

    Job costing is used where output consists of separately identifiable jobs, each different from the next. A cost record is opened for each job and the materials, labour and expenses belonging to it are charged to that record.

  2. Question 2

    A product uses 2 kg of Material A at €4 per kg, no Material B, and 2 kg of Material C at €2 per kg. What is its direct material cost per unit?

    • €12
    • b€8
    • c€10
    • d€16

    Material A is 2 kg × €4 = €8 and Material C is 2 kg × €2 = €4. With no Material B used, the direct material cost per unit is €8 + €4 = €12.

  3. Question 3

    A pottery books 400 kg of clay at €4.50 per kg to a batch of fruit bowls. What is the clay cost of the batch?

    • €1,800
    • b€400
    • c€900
    • d€4.50

    The clay cost is 400 kg × €4.50 = €1,800.

  4. Question 4

    A boatyard issues 120 metres of mahogany strip at €16 per metre to one yacht. What is the mahogany cost charged to that job?

    • €1,920
    • b€120
    • c€1,600
    • d€736

    The charge is 120 metres × €16 = €1,920.

  5. Question 5

    A department budgets for 50,400 labour hours but only 6,750 machine hours. Which absorption basis is more appropriate for its overheads?

    • Labour hours, because the department's activity is driven mainly by people rather than machines
    • bMachine hours, because they are the smaller figure
    • cUnits produced, regardless of the hours worked
    • dDirect material cost, because materials are always the largest cost

    The absorption basis should reflect what actually drives the overheads. With labour hours far exceeding machine hours the work is labour-intensive, so a labour-hour rate spreads the overhead sensibly.

  6. Question 6

    A production stage budgets overheads of €54,000 and absorbs them over 3,000 machine hours. What is its absorption rate?

    • €18 per machine hour
    • b€8 per machine hour
    • c€13 per machine hour
    • d€54 per machine hour

    The rate is €54,000 ÷ 3,000 machine hours = €18 per machine hour.